Fuxing (train)

Fuxing (simplified Chinese: 复兴号; traditional Chinese: 復興號; pinyin: Fùxīng Hào; lit. 'Rejuvenation') (also known as the CR series EMU, or as the Fuxing Hao) is a series of high-speed and higher-speed EMU trains operated by China Railway High-speed (CRH) and developed by CRRC. They are the first successful high-speed trains to be fully designed and manufactured in China.

Fuxing (Rejuvenation)
CR400AF-2001 departing Beijing South railway station as G123
In serviceAugust 15, 2016 (August 15, 2016) – Present
ManufacturerCRRC Qingdao Sifang
CRRC Changchun Railway Vehicles
CRRC Tangshan Railway Vehicle
FormationCR400AF/BF/CR300AF/BF/KCIC400AF: 8 cars/trainset (4M4T)
CR400AF–A/BF–A:16 cars/trainset (8M8T)
CR400AF–B/BF–B:17 cars/trainset (8M9T)
CapacityCR400AF/BF: 556 or 576
CR400AF–A/BF–A: 1193
CR400AF–B/BF–B: 1283
OperatorsChina Railway Corporation
PT Kereta Cepat Indonesia China
Lines served
Specifications
Train lengthCR400AF: 209 m (685 ft 8 in)
CR400AF–A: 414 m (1,358 ft 3 in)
CR400BF: 209.06 m (685 ft 11 in)
CR400BF–A: 414.26 m (1,359 ft 1 in)
CR400AF–B: 439.9 m (1,443 ft 3 in)
CR400BF–B: 439.9 m (1,443 ft 3 in)
Width3,360 mm (11 ft 0 in)
Height4,050 mm (13 ft 3 in)
Platform height1,250 mm (4 ft 1.2 in)
Maximum speed
  • Service: 350 km/h (220 mph)
  • Design: 400 km/h (250 mph)
  • Record:
  • 420 km/h (260 mph)
Axle load<17 t (16.7 long tons; 18.7 short tons)
Traction systemWater cooling IGBT-VVVF inverter control (Zhuzhou CRRC Times Electric)
Traction motorsYQ-625 external sector 3-phase AC induction motor (Zhuzhou CRRC Times Electric)
Electric system(s)25 kV 50 Hz AC Overhead catenary
Current collector(s)Pantograph
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Fuxing
Simplified Chinese复兴号
Traditional Chinese復興號
Literal meaningRejuvenation
Alternative Chinese name
Simplified Chinese中国标准动车组
Traditional Chinese中國標準動車組
Literal meaningChina Standardized EMU

Initially known as the China Standardized EMU, development on the project started in 2012, and the design plan was finished in September 2014. The first EMU rolled off the production line on 30 June 2015. The series received its current designation of Fuxing in June 2017, with nicknames such as "Red Dragon" (CR400AF) and "Golden Phoenix" (CR400BF) for certain units. It is among the world's fastest conventional high-speed trains in regular service, with an operating speed of 350 km/h (220 mph) for the CR400AF and CR400BF models.

Internationally exported versions of the train sets also operate in Indonesia on the Jakarta-Bandung high-speed railway from 2023, with a derivative version of the CR400AF, also known as the KCIC400AF or "Komodo Merah" (literally: red komodo dragon) or "Petir Merah" (literally: red lightning).

The upcoming CR450, designed for a maximum operating speed of 400 km/h (250 mph), is expected to enter service by 2025. In 2023, Chinese state media reported a CR450 train attained a speed of 453 km/h (281 mph) during a test run.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.