Hyderabad Metro

The Hyderabad Metro is a rapid transit system, serving the city of Hyderabad, Telangana, India. It is the third longest operational metro network in India after Delhi Metro and Namma Metro (Bengaluru), and the lines are arranged in a secant model. It is funded by a public–private partnership (PPP), with the state government holding a minority equity stake. Hyderabad Metro is the world's largest elevated Metro Rail system based on DBFOT basis (Design, Build, Finance, Operate and Transfer). A special purpose vehicle company, L&T Metro Rail Hyderabad Ltd (L&TMRHL), was established by the construction company L&T to develop the Hyderabad metro rail project.

Hyderabad Metro
Overview
OwnerHyderabad Metro Rail Ltd. (HMRL)
Area servedHyderabad Metropolitan Region
LocaleHyderabad, Telangana
Transit typeRapid Transit
Number of lines3 (Fully operational)
1 (Under-construction)
Line number
Number of stations57
Daily ridership547,000 (Nov 2023)
Annual ridership8 million
Chief executiveN.V.S Reddy (Managing director)
HeadquartersMetro Rail Bhavan, Begumpet, Hyderabad 500003
Website
Operation
Began operation29 November 2017 (2017-11-29)
Operator(s)Keolis Hyderabad Mass Rapid Transit System
CharacterFully elevated
Rolling stockHyundai Rotem
Train length3-car trains
Headway3.5 - 7 minutes
Technical
System length71.1 km (44.2 mi) (Operational)
5.5 km (3.4 mi) (Under Survey)
63 km (39 mi) (DPR submitted)
278 km (173 mi) (cabinet approved)
No. of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Minimum radius of curvature120 metres (390 ft)
Electrification25 kV 50 Hz AC overhead catenary
Average speed35 to 40 km/h (22 to 25 mph)
Top speed80 km/h (50 mph)
Hyderabad Metro
Phase I
Miyapur
JNTU College
Raidurg
KPHB Colony
Hitec City
Kukatpally
Durgam Cheruvu
Balanagar
Madhapur
Moosapet
Peddamma Gudi
Bharat Nagar
Jubilee Hills
Check Post
Erragadda
Road No 5
Jubilee Hills
ESI Hospital
Yusufguda
S.R. Nagar
Madhura Nagar
Ameerpet
Punjagutta
Begumpet
Irrum Manzil
Prakash Nagar
Khairatabad
Rasoolpura
Lakdi-ka-pul
Paradise
Assembly
JBS Parade Ground
Nampally
Parade Ground
Gandhi Bhavan
Osmania
Medical College
Secunderabad
West | Jn | East
Mettuguda
Gandhi Hospital
Tarnaka
Musheerabad
Habsiguda
R.T.C. X Roads
NGRI
Chikkadpally
Stadium
Narayanaguda
Uppal
Sultan Bazaar
Nagole
MG Bus Station
Malakpet
Salarjung Museum
New Market
Charminar
Musarambagh
Shah-Ali-Banda
Dilsukhnagar
Shamsherganj
Chaitanyapuri
Jungametta
Victoria Memorial
Falaknuma
LB Nagar
Red Line
Green Line
Blue Line
Indian Railways lines

A 30-kilometre (19 mi) stretch from Miyapur to Nagole, with 24 stations, was inaugurated on 28 November 2017 by Prime Minister Narendra Modi. This was the longest rapid transit metro line opened in one go in India. It is estimated to cost 18,800 crore (US$2.4 billion). As of February 2020, about 490,000 people use the Metro per day. Trains are crowded during the morning and evening rush hours. A ladies only coach was introduced on all the trains from 7 May 2018. Post-COVID, 450,000 passengers were travelling on Hyderabad Metro daily on average by December 2022. On 3 July 2023, Hyderabad Metro Rail achieved ridership clocking in at 0.51 million on that day.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.