China Railway CRH1

The CRH1 EMU, also known as Hexie (simplified Chinese: 和谐号; traditional Chinese: 和諧號; pinyin: Héxié Hào; lit. 'Harmony'), is a high-speed train operated by China Railway and built by a joint venture between Bombardier Transportation and Sifang at Bombardier Sifang Power Transportation factory in Qingdao, Shandong Province, People's Republic of China.

China Railways CRH1 EMU
CRH1 high-speed train
In service1 February 2007–present
ManufacturerBombardier Sifang (Qingdao) Transportation Ltd.
(Bombardier Transportation and CSR Sifang)
Family nameRegina Zefiro
Number builtCRH1A: 128 trainsets (1024 cars)
CRH1A–A: 87 trainsets (696 cars)
CRH1B: 24 trainsets (384 cars)
CRH1E: 15 trainsets (240 cars)
CRH1E–NG: 5 trainsets (80 cars)
CRH380D: 85 trainsets (680 cars)
FormationCRH1A/A–A: eight cars per trainset (5M3T)
CRH1B/E/E–NG: 16 cars per trainset (10M6T)
CRH380D: eight cars per trainset (4M4T)
CapacityCRH1A: 668 or 611 or 646 or 635
CRH1A–A: 613
CRH1B: 1299
CRH1E/E–NG: 618 or 642
CRH380D: 495
OperatorsChina Railway
- CR Guangzhou
- CR Shanghai
- CR Nanchang
- CR Chengdu
Lines servedHigh speed and major conventional rail lines in southern China
Specifications
Car body constructionCRH1A/B/E: Stainless Steel
CRH1A–A/E–NG/380D: Aluminium Alloy
Train lengthCRH1A: 213.5 m (700 ft 6 in)
CRH1A–A: 207.9 m (682 ft 1 in)
CRH1B: 426.3 m (1,398 ft 7 in)
CRH1E: 428.9 m (1,407 ft 2 in)
CRH1E–NG: 413.1 m (1,355 ft 4 in)
CRH380D: 215.3 m (706 ft 4 in)
Platform height500–1,250 mm (1 ft 7.7 in – 4 ft 1.2 in)
Maximum speedCRH1A:200 km/h (124 mph)or 250 km/h (155 mph)
CRH1A–A/B/E/E–NG:250 km/h (155 mph)
CRH380D: 380 km/h (236 mph)
WeightCRH1A/A–A:435 t (428 long tons; 480 short tons)
CRH1B:850 t (837 long tons; 937 short tons)
CRH1E/E–NG:890 t (876 long tons; 981 short tons)
CRH380D:450 t (443 long tons; 496 short tons)
Traction systemWater cooling IGBT-VVVF inverter control (Bombardier MITRAC 1000)
Traction motors3-phase AC induction motor (Bombardier DR-1200 [CRH1A] or DR-1500 [CRH1B/E])
Power outputCRH1A: 5.3 MW (7,107 hp)
CRH1A–A: 5.5 MW (7,376 hp)
CRH1B/E/E–NG: 11 MW (14,751 hp)
CRH380D: 10 MW (13,410 hp)
TransmissionAC-DC-AC
AccelerationCRH1A/B/E:Maximum 0.6 m/s2 (1.3 mph/s)
CRH380D: 0.48 m/s2 (1.1 mph/s)
DecelerationCRH1A:Emergency 1.2 m/s2 (2.7 mph/s)
General 0.8 m/s2 (1.8 mph/s)
Electric system(s)25 kV 50 Hz AC Overhead catenary
Current collector(s)Pantograph
Braking system(s)Regenerative, electronically controlled pneumatic brakes
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

At the same time as ordering the Shinkansen-based CRH2A and the Pendolino-based CRH5A, the Chinese Ministry of Railways ordered Bombardier-based CRH1, specifically 20 CRH1A trainsets in June 2007 and an additional 20 CRH1A trains, each with eight cars that have total standard capacity of 670 people. The total value of the order is €560 million. In July 2010, a further 40 CRH1A eight-car trains were ordered.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.