AEC metro station

AEC is an elevated metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India. Around this metro station holds the main and upcoming Sabarmati HSR Terminal railway station along with AEC Garden Park and Torrent Power Limited.

AEC
Ahmedabad Metro station
General information
LocationDharm Nagar II, Sabarmati, Ahmedabad, Gujarat 380005
Coordinates23.07511°N 72.59321°E / 23.07511; 72.59321
Owned byGujarat Metro Rail Corporation Limited
Operated byAhmedabad Metro
Line(s)Red Line
PlatformsSide platform
Platform-1 → Motera Stadium
Platform-2 → APMC
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes
Other information
StatusOperational
History
Opening6 October 2022 (6 October 2022)
Electrified750 V DC third rail
Services
Preceding station Ahmedabad Metro Following station
Sabarmati
towards Motera Stadium
Red Line Sabarmati Railway Station
towards APMC
Location

This phase of the metro system was inaugurated on 30 September 2022 by Prime Minister Narendra Modi and was opened to the public on 6 October 2022.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.