Kolkata Metro Line 5

The Baranagar to Barrackpore, 12.50 km (7.77 mi) metro corridor (Line 5) in North 24 Parganas, is another line of Kolkata Metro, in Indian state of West Bengal. It was sanctioned in 2009, at a cost of Rs.2070 crore, to enable a quicker commute from the northern suburbs to Kolkata, via North Kolkata.

Kolkata Metro Line 5

Baranagar-Barrackpore Metro
Overview
StatusPlanned but Construction not started
OwnerMetro Railway, Kolkata
Locale Greater Kolkata
Termini
Connecting linesBlue Line
Stations11
Websitehttps://mtp.indianrailways.gov.in
Service
TypeRapid transit
SystemKolkata Metro
Operator(s)Metro Railway, Kolkata
Depot(s)Noapara Depot
Technical
Line length12.50 kilometres (7.77 mi)
Number of tracks2
CharacterElevated
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification750 V DC using third rail
Operating speed80 km/h (designed)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.