Kolkata Metro Line 4
The Kolkata Metro Line 4 or the Yellow Line, also known as the Noapara - Barasat Line of the Kolkata Metro in India is a 16.876 km (10.486 mi) long metro route from Noapara to Barasat in North 24 Parganas, which is under construction. It is being built by RVNL, Senbo & ITD. It will run mostly underground viaducts. The track will be elevated until Jessore Road Station and then go underground towards Barasat metro station. It will have an interchange station at the NSCBI Airport with Kolkata Metro Line 6.
Kolkata Metro Line 4 Noapara - Barasat | |||
---|---|---|---|
Under construction elevated railway of Kolkata Metro Line 4 or Yellow Line near Bagjola canal | |||
Overview | |||
Status | Under construction | ||
Owner | Metro Railway, Kolkata | ||
Locale | Kolkata Metropolitan Area, India | ||
Termini |
| ||
Connecting lines | Blue Line Orange Line | ||
Stations | 10 | ||
Service | |||
Type | Rapid transit | ||
System | Kolkata Metro | ||
Operator(s) | Metro Railway, Kolkata | ||
Depot(s) | Noapara Depot Airport Depot Barasat Depot | ||
History | |||
Planned opening | April 2024 (Noapara - Dum Dum Cantonment) | ||
Technical | |||
Line length | 18.13 kilometres (11.27 mi)
6.87 kilometres (4.27 mi) (Under Construction) 11.26 kilometres (7.00 mi) (Planned)) | ||
Number of tracks | 2 | ||
Track gauge | 5 ft 6 in (1,676 mm) broad gauge | ||
Electrification | 750 V DC using third rail | ||
Operating speed | 80 km/h (designed) | ||
|
The line is targeted to open from Noapara to Dum Dum Cantonment on April 2024.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.