Koçköprü Dam
Koçköprü Dam is a dam in the Van province of Eastern Turkey. The development was backed by the Turkish State Hydraulic Works.
Koçköprü Dam | |
---|---|
Location | Turkey |
Coordinates | 39.1222°N 43.3284°E |
Construction began | 1978 |
Opening date | 1992 |
Dam and spillways | |
Length | 693 meters |
When it was built between 1978 and 1992, the dam was constructed over the old Ağaçören village. A hydroelectric power plant that is placed over the dam started operation in 2020, and the reservoir water level has since decreased. This has resulted in a large amount of human bones being washed ashore.