Kepier power station

The Kepier power station was a cancelled coal-fired power station on the River Wear at Kepier, 0.75 miles (1.21 km) north east of Durham, County Durham, North East England. Planned by the North Eastern Electric Supply Company (NESCo) in 1944, it was never realised as the scheme faced stiff opposition from those who claimed it would obstruct views of the historic Durham Cathedral from the East Coast Main Line. A number of people supported the scheme as it would help meet the increasing demand for electricity and provide much needed jobs in the post-depression, post-war economy of Britain. The station, which had been designed by architect Giles Gilbert Scott, would have been operational by the late 1940s and would have generated 150 megawatts of electricity. However, following a public inquiry the plans were not approved and instead NESCo installed additional capacity at their existing power stations.

Kepier power station
The proposed site in December 2009
CountryEngland
LocationKepier, County Durham
Coordinates54.786°N 1.562°W / 54.786; -1.562
StatusCancelled
Construction cost£3,500,000 (planned)
Owner(s)North Eastern Electric Supply Company
Thermal power station
Primary fuelCoal
Power generation
Nameplate capacity150 MW
External links
CommonsRelated media on Commons
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.