Houay Ho Dam
The Houay Ho is a dam located in Samakkhixay District of Attapeu Province, Laos, 160 km (99 mi) east of Pakse and 30 km (19 mi) northwest of Attapeu. The project is considered the first privately financed joint venture 'build-operate-transfer' (BOT) hydropower project in Laos. It has installed capacity of 152.1 megawatts (204,000 hp), almost all of which is exported to Thailand.
Houay Ho | |
---|---|
Location of Houay Ho in Laos | |
Location | Attapeu Province, Laos |
Coordinates | 15°3′34″N 106°45′39″E |
Opening date | 1999 |
Construction cost | US$243,000,000 |
Owner(s) | Houay Ho Power Co. |
Dam and spillways | |
Type of dam | Concrete Face Rockfill |
Impounds | Houay Ho River |
Height | 79 m (259 ft) |
Reservoir | |
Total capacity | 3.53 km3 (2,860,000 acre⋅ft) |
Catchment area | 192 km2 (74 sq mi) |
Surface area | 37 km2 (14 sq mi) |
Power Station | |
Operator(s) | Houay Ho Power Co. Ltd (HHPC) |
Commission date | September 3, 1999 |
Turbines | 2 x 75 MW and 1 x 2.1 MW. |
Installed capacity | 152.1 MW (204,000 hp) |
Annual generation | 450 GWh (1,600 TJ) |
Website http://www.houayho.com |
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.