Holmestrandsporten
The Holmestrandsporten Tunnel (Holmestrandsporten) is a 12,300-meter (7.6 mi) long double track railway tunnel which runs through Holmestrandfjellet in Holmestrand and Tønsberg in Vestfold, Norway. It was opened for traffic on Monday 28 November 2016.
Southern entrance, February 2016 | |
Overview | |
---|---|
Line | Vestfold Line |
Location | Holmestrandfjellet, Holmestrand, Norway |
Coordinates | 59.492046°N 10.310605°E |
Start | Holm, Sande |
End | Snekkestad, Re |
Operation | |
Opened | 2016 |
Owner | Norwegian National Rail Administration |
Technical | |
Line length | 12,300 m (7.6 mi) |
No. of tracks | Double |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrified | 15 kV 16.7 Hz AC |
Operating speed | 250 km/h (160 mph) |
Located on the Vestfold Line, the tunnel was built as part of the 14.3-kilometer (8.9 mi) double-track high-speed segment from Holm to Nykirke. The new Holmestrand Station is located inside the mountain in the middle of the tunnel. The total cost of the project was estimated to be 6.6 billion Norwegian Kroner upon completion. The new tunnel reduces traveling time on the Vestfold Line by five minutes.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.