Guiyang–Nanning high-speed railway
The Guiyang–Nanning high-speed railway is a high-speed railway between Guiyang and Nanning in China. The railway will be 512 km (318 mi) in length, of which 482 km (300 mi) is newly build. Travel time between the two cities will be cut from 10 hours to 2.5 hours. It will be part of the Baotou (Yinchuan)–Hainan corridor.
Guiyang–Nanning high-speed railway 贵南高速铁路 | |
---|---|
Overview | |
Status | Operational (Guiyang–Libo section) |
Locale | Guizhou and Guangxi, China |
Termini |
|
Service | |
Services | 1 |
Operator(s) | China Railway Chengdu Group & China Railway Nanning Group |
History | |
Opened | 8 August 2023 |
Technical | |
Line length | 512 km (318 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 350 km/h (217 mph) |
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.