Green line (Taoyuan Metro)

The Green line is a light metro line of the Taoyuan Metro that is under construction. The green line will join with the Taoyuan Airport MRT at Kengkou and Hengshan.

Green Line
Overview
Native name桃園捷運綠線
StatusUnder construction
LocaleTaoyuan
Termini
Stations29
Service
TypeRapid transit
SystemTaoyuan Metro
Operator(s)Taoyuan Metro Corporation
Depot(s)
  • North
  • South
History
Planned opening
  • 2026 (Phase 1 - elevated mainline)
  • 2030 (Phase 2 - underground mainline)
  • 2031 (Aerotropolis branch to Hengshan)
  • 2032 (Zhongli extension)
Technical
Line length
  • Main line: 27.8 km (17.3 mi)
  • Zhongli extension: 7.2 km (4.5 mi)
  • Daxi extension: 4.33 km (2.69 mi)
CharacterElevated and underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Route map

( Airport MRT)
G32/A11 Kengkou
Nankan River
G31 Guolin
G18/A16 Hengshan
G17 Taoyuan Aerotropolis 3rd
G16 Taoyuan Aerotropolis 2nd
G15 Taoyuan Aerotropolis 1st
G14 Changxing
( Taiwan High Speed Rail )
G13a Luzhu Ind. Park
North Depot
G13 Nanzhu
National Freeway 1
G12 Nankan Bus Station
G11 Taoyuan P. Arts Center
G10 Daxing W. Rd. Intersection
G09 Minguang Rd.
G08 Yong'he Market
(TRA West Coast line )
G07/BRH01 Taoyuan Main Station
G06 Yangming Park
National Freeway 2
G05 Tongan
G04/LB14 Da'nan
(Sanying line )
G03 Mayuan
G02 Jianguo Rd.
G01 Bade
GA1 Puding Sunbeam
GA2 Renshan Elementary School
GA3 Puding Transshipment Station
South Depot
GE01 Xiaoli
GE02 Shixiao
GE03 Futai Elementary School
GE04 Veterans' Service
GE05/A24 Zhongli Sports Park
A23 Zhongli Station
( Airport MRT)
(TRA West Coast Line )

Construction on the Green line began in Bade District, Taoyuan on 15 October 2018. A groundbreaking ceremony was held on 11 October 2019 and the first phase of the line between Nanzhu Road and Kengkou is projected to open in 2026.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.