Green Line (Chennai Metro)

The Green Line or Line 2 is one of the two lines of Chennai Metro, Phase 1 Project. The line stretches from Chennai Central to St. Thomas Mount. Out of the 17 stations, 9 stations are underground and 8 are elevated.

Green Line (Line 2)
Chennai Metro Green Line
Overview
Native nameபச்சை வழிதடம்
StatusFully Operational
LocaleChennai
Termini
Stations18
Service
TypeRapid transit
SystemChennai Metro
Operator(s)Chennai Metro Rail Limited
History
Opened25 September 2015 (2015-09-25)
Technical
Line length22 km (14 mi)
Number of tracks2
Character9.7 km Underground and 12.3 km Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Operating speed80 km/h (50 mph)
Route map

Chennai Suburban Railway
South Line & South West Line
M.G.R Central
Egmore
Chennai Suburban Railway
South Line & South West Line
Nehru Park
Kilpauk Medical College
Pachaiyappa's College
Shenoy Nagar
Anna Nagar East
Anna Nagar Tower
Thirumangalam
NH4
Koyambedu depot
Koyambedu
Jayalalithaa CMBT
Arumbakkam
Vadapalani
Ashok Nagar
Ekkattuthangal
Arignar Anna Alandur
St. Thomas Mount
 MRTS 
Chennai Suburban Railway
South Line & South West Line
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.