ElecLink

ElecLink is a 1,000 MW high-voltage direct current (HVDC) electrical interconnector between the United Kingdom and France, passing through the Channel Tunnel. ElecLink commenced operations on 25 May 2022.

ElecLink
Map of ElecLink
Location
CountryUnited Kingdom, France
Coordinates51°5′54.2″N 1°8′40.9″E
50°55′12.7″N 1°46′50.2″E
General directionNorth–South
FromFolkestone, United Kingdom
Passes throughEnglish Channel
ToPeuplingues, France
Ownership information
OwnerGetlink
Construction information
Manufacturer of conductor/cablePrysmian
Manufacturer of substationsSiemens
ContractorsBalfour Beatty
Construction started2017
Construction cost£490 million
Commissioned25 May 2022
Technical information
Typesubmarine cable
Type of currentHVDC
Total length51 km (32 mi)
Power rating1,000 MW
DC voltage±320 kV
No. of poles2
No. of circuits1
Websitewww.eleclink.co.uk