East Taunton station

East Taunton station is an under-construction MBTA Commuter Rail station in East Taunton, Massachusetts adjacent to the interchange between the Route 24 expressway and County Street (Route 140). It is planned to open in mid-2024 as part of the first phase of the South Coast Rail project.

East Taunton
East Taunton station under construction in 2024
General information
LocationIndustrial Drive off Route 140
Taunton, Massachusetts
Coordinates41.86799°N 71.06148°W / 41.86799; -71.06148
Line(s)New Bedford Secondary
Platforms1 island platform (under construction)
Tracks3 (2 station tracks, 1 freight bypass)
Connections GATRA: 8
Construction
AccessibleYes
History
Openingmid-2024 (planned)
Passengers
2030420 daily boardings (projected):66
Planned services
Preceding station MBTA Following station
Middleborough
Phase 1 (2023)
toward South Station
South Coast Rail Freetown
toward Fall River
Taunton
Phase 2 (2030)
toward South Station
Church Street
toward New Bedford

A former East Taunton station, located to the east on a different line, was served by the New York, New Haven and Hartford Railroad and several predecessors until 1927. In 2009, South Coast Rail planning identified Taunton Depot, just north of Middleborough Junction (Cotley Junction), as a preferred station site. A 2017 re-evaluation of the project recommended an interim route through Middleborough, with East Taunton station located just south of the junction. A construction contract was issued in 2020.