EA203 series

The EA203 series is an Electric Multiple Unit produced by Industri Kereta Api, in collaboration with Bombardier which will be used as Soekarno–Hatta Airport Rail Link express services from Manggarai Station in Jakarta to Soekarno–Hatta International Airport at Tangerang, Banten. EA203 series was purchased by PT Railink, a joint venture between PT Kereta Api Indonesia and PT Angkasa Pura II which is the operator of the airport train in Indonesia, totaling 60 units divided into 10 series with 6 car formations. EA203 series was sent from its factory in Madiun to Jakarta in stages starting in August 2017.

EA203 series
EA203 series arrived at Manggarai Station.
In service2017present
ManufacturerPT Industri Kereta Api
Bombardier Transportation
Constructed2017
Entered service26 December 2017
Number built30 units (10 sets)
Number in service60 units (10 sets)
PredecessorEA202 series
Formation6 carriages per set
Fleet numbersK1 1 17 07-K1 1 17 66
Capacity272 seats
Operators
DepotsManggarai (MRI)
Lines served Airport Railink Soekarno-Hatta
Specifications
Car body constructionStainless steel
Car length20 m (65 ft 7 in)
Width2.99 m (9 ft 10 in)
Height3.76 m (12 ft 4 in) (top of AC)
Doors2 pocket doors per side
Maximum speed100 km/h (62 mph)
Weight35,500–39,000 kg (78,300–86,000 lb)
Traction systemBombardier MITRAC IGBT–VVVF
Acceleration0.8 m/s²
Deceleration0.8 m/s² (normal)
1.0 m/s² (emergency)
AuxiliariesStatic Inverter (SIV)
HVACICOND
Electric system(s)1,500 V DC overhead lines
Current collector(s)Pantograph
BogiesBolsterless Bogie
Type: MB-514 (motor), TB-914 (trailer)
Braking system(s)Electro-pneumatic, regenerative
Safety system(s)TMS and Deadman Control
Coupling systemAAR/Janney coupler
Multiple workingnone
Track gauge1,067 mm (3 ft 6 in)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.