Convention Centre Precinct

The Christchurch Convention Centre Precinct is located in Christchurch Central City, New Zealand. It includes Te Pae convention centre. The construction of the precinct was funded by the Crown as part of the Christchurch Central Recovery Plan following the 2011 Christchurch earthquake.

Christchurch Convention Centre Precinct
LocationChristchurch Central City, Christchurch, New Zealand
Coordinates43.52969°S 172.63557°E / -43.52969; 172.63557
OwnerŌtākaro Ltd
OperatorASM Global
ArchitectWoods Bagot & Warren and Mahoney
Opened17 December 2021 (2021-12-17)
Construction cost
NZ$ 450 million
Theatre seating
1,400
Enclosed space
  Exhibit hall floor2,800 square metres (30,000 sq ft)
  Breakout/meeting1,600 square metres (17,000 sq ft)
Website
https://www.tepae.co.nz/

The precinct has an area of approximately 1.7 hectares (4.2 acres).

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.