Christchurch Airport

Christchurch Airport (IATA: CHC, ICAO: NZCH) is the main airport that serves Christchurch, New Zealand. It is located 12 kilometres (7.5 mi) to the northwest of the city centre, in the suburb of Harewood. Christchurch (Harewood) Airport officially opened on 18 May 1940 and became New Zealand's first international airport on 16 December 1950. It is the second busiest airport in New Zealand, after Auckland and before Wellington by annual passengers, and the second busiest, after Auckland, by aircraft movements.

Christchurch Airport
Summary
Airport typePublic/military
OwnerChristchurch City Council (75%)
NZ Government (25%)
OperatorChristchurch International Airport Limited
ServesChristchurch
LocationHarewood, Christchurch, New Zealand
Opened1937 (1937)
Hub forAir New Zealand
Elevation AMSL37 m / 123 ft
Coordinates43°29′22″S 172°31′56″E
Websitewww.christchurchairport.co.nz
Map
CHC
Location of the airport in Christchurch
CHC
CHC (New Zealand)
CHC
CHC (Oceania)
Runways
Direction Length Surface
m ft
02/20 3,288 10,785 Asphaltprimary
11/29 1,741 5,712 Asphaltsecondary
02/20 515 1,690 Grass – Aero Club
Helipads
Number Length Surface
m ft
3 12 39 Grass
Statistics (Year to 30 June 2023)
Passengers (total)5,690 708
Movements94,955

Christchurch and Auckland are the only airports in New Zealand that regularly handle Boeing 747 and Airbus A380 aircraft. The airport is curfew free, operating 24 hours a day.

The prevailing wind in Christchurch is from the north-east and to a lesser extent from the south-west, but the city is also affected by Canterbury's nor'wester foehn wind. As a result, the airport has two perpendicular runways: a 3,288-metre (10,787 ft) primary runway (02/20) oriented with the north-easterly and south-westerly prevailing winds, and a 1,741-metre (5,712 ft) secondary runway (11/29) oriented for use during nor'westers. The airport also has a third grass runway, parallel to the primary runway, for use by general aviation. To serve an increasing number of passengers, the airport has completed construction of a major terminal upgrade. The new construction's primary wing opened in 2011 and the upgrade was completed in 2013.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.