CRRC Qingdao Sifang CR151

The CRRC Qingdao Sifang CR151 is a type of electric multiple unit to be built for the Cross Island Line of Singapore's Mass Rapid Transit (MRT) system. The contract was awarded to CRRC Sifang, a consortium of CRRC Qingdao Sifang Co and Singapore CRRC Sifang Railway Vehicles Service, and as of June 2023 the Land Transport Authority (LTA) has purchased 44 six-car trains. They will be delivered from 2027, before the opening of the line's first phase in 2030.

CRRC Qingdao Sifang CR151
In service2030
ManufacturerCRRC Qingdao Sifang
Built atQingdao, Shandong, China
Constructed2025 – 2030
Entered service2030
Number under construction264 Vehicles (44 Sets)
Formation6/8 per trainset
DepotsChangi East
Lines served CRL  Cross Island Line
Specifications
Car body constructionWelded aluminium
Doors10 per car, 5 per side
Maximum speed90 km/h (56 mph) (service)
Electric system(s)1,500 V DC Overhead conductor rail
Current collector(s)Pantograph
Safety system(s)Siemens Trainguard Sirius moving block CBTC ATC under ATO GoA 4 (UTO)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.