Bunyip railway station

Bunyip railway station is located on the Gippsland line in Victoria, Australia. It serves the town of Bunyip, and opened on 8 October 1877.

Bunyip
PTV regional rail station
Westbound view in March 2015
General information
LocationNar Nar Goon–Longwarry Road,
Bunyip, Victoria 3815
Shire of Cardinia
Australia
Coordinates38°05′56″S 145°43′15″E
Owned byVicTrack
Operated byV/Line
Line(s)Gippsland
Distance79.09 kilometres from
Southern Cross
Platforms1
Tracks1
Connections Bus
Construction
Structure typeAt-grade
ParkingYes
AccessibleYes
Other information
StatusOperational, unstaffed
Station codeBYP
Fare zoneMyki Zone 4/5 overlap
WebsitePublic Transport Victoria
History
Opened8 October 1877 (1877-10-08)
Services
Preceding station V/Line Following station
Garfield
towards Southern Cross
Gippsland line Longwarry
towards Traralgon or Bairnsdale
Location
Bunyip
Location within Victoria

The remains of a former goods and stock platform and a crane are opposite the single platform. The siding for the platform was removed in April 1988.

The track up to the western (up) end of the station was duplicated in 1956, but the section from Bunyip to Longwarry remains as single track, due to the need to duplicate the bridge over the Bunyip River. The line through Bunyip was electrified in July 1954, but the electrification was switched off between Bunyip and Warragul in December 1998, and between Pakenham and Bunyip in 2005, as part of the Regional Fast Rail project. A substation and a short section of the overhead wiring, both of which are listed on the Victorian Heritage Register, have been retained to the west of the station.

On 26 August 1988, the electric staff system between Bunyip and Longwarry was abolished, and was replaced with automatic three-position signalling. The signal box, interlocking, and all two-position signals, were also abolished.

The station was de-staffed on 26 May 1991.

As part of the Regional Rail Revival project, a second platform will be provided at the station, and the line duplicated between Bunyip and Longwarry. The project is to be completed in late 2022. However, it was reported in May 2022, that the duplication of the Bunyip-Longwarry track would not go ahead.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.