British Rail Class 777

The British Rail Class 777 METRO is a class of electric multiple unit passenger trains currently being delivered by the Swiss rolling stock manufacturer Stadler Rail, being used on the Merseyrail network in the Liverpool City Region and adjacent areas of Cheshire and Lancashire. The trains have the ability to operate on the third rail-powered sections of the network, with some units carrying onboard batteries to allow use on unpowered track. Ordered in 2016, construction of the units began in 2018. The first unit entered service on 23 January 2023, following delays to the deployment programme. The Class 777 will replace Merseyrail's current Class 507 and Class 508 units, which were built between 1978 and 1980. Seven units of the total 53 ordered are being configured as battery electric multiple units (BEMUs) for use on non-electrified lines, being designated subclass 777/1.

British Rail Class 777
METRO
Merseyrail Class 777 at Hooton
In service23 January 2023  present
ManufacturerStadler Rail
Assembly
  • Stadler Altenrhein AG
  • Stadler Rheintal AG
Built at
  • Altenrhein, Switzerland
  • Siedlce, Poland
Family nameMETRO
Replaced
Constructed2018–Present
Number built53
Formation
  • 4 cars per unit:
  • DTSO-MSO-MSO-DTSO
Fleet numbers(see § Fleet details)
Capacity182 seats
OwnersMerseytravel
OperatorsMerseyrail
Depots
Lines served
  • Northern Line
  • Wirral Line
Specifications
Car body constructionAluminium
Train length64.98 m (213 ft 2 in)
Width2.820 m (9 ft 3.0 in)
Height3.828 m (12 ft 6.7 in)
Floor height960 mm (3 ft 2 in)
DoorsDouble-leaf sliding plug, each 1.300 m (4 ft 3.2 in) wide (total 6 per side)
Wheel diameter760 mm (30 in)
WheelbaseBogies: 2.400 m (7 ft 10.5 in)
Maximum speed
  • On external supply:
    75 mph (120 km/h)
  • 777/1 in battery mode:
    62 mph (100 km/h)
Weight99 t (97 long tons; 109 short tons)
Traction systemIGBT-VVVF
Traction motors6 × TSA TMF 50-20-4,
each of 250 kW (340 hp)
Power output
  • At wheels:
  • Max.: 2,100 kW (2,800 hp)
  • Cont.: 1,500 kW (2,000 hp)
Tractive effortStarting: 162 kN (36,000 lbf)
AccelerationStarting: 1.1 m/s2 (3.6 ft/s2)
Electric system(s)750 V DC third rail
Current collector(s)Contact shoe
UIC classification2′(Bo)′(Bo)′(Bo)′2′
Braking system(s)Electro-pneumatic and regenerative
Safety system(s)
Coupling systemDellner
Multiple workingWithin class (max. 2 units)
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Notes/references
Sourced from unless otherwise noted.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.