Addison Airport Toll Tunnel

The Addison Airport Toll Tunnel (abbreviated AATT) is a road tunnel in Addison, Texas that carries Keller Springs Road underneath Addison Airport. The tunnel is operated by the North Texas Tollway Authority (NTTA) and uses open road tolling through NTTA's TollTag system.

Addison Airport Toll Tunnel
Overview
Other name(s)AATT
LocationAddison, Texas
Coordinates32.9685°N 96.8360°W / 32.9685; -96.8360
RouteKeller Springs Road
CrossesAddison Airport
StartMidway Road
EndAddison Road
Operation
Work begunSeptember 1997
OpenedFebruary 18, 1999
OperatorNorth Texas Tollway Authority
Toll$0.74 by electronic toll collection
$1.48 by mail invoice
Technical
Length1,600 feet (490 m)
No. of lanes2
Operating speed40 miles per hour (64 km/h)
Tunnel clearance16 feet 6 inches (5.03 m)
Route map

The tunnel connects the western and eastern barrier roads of Addison Airport (Midway Road and Addison Road, respectively). This provides a through passage between Dallas North Tollway and Interstate 35E, reducing traffic on Belt Line Road and Trinity Mills Road.

The tunnel proper is 1,600 feet (488 m) long, while the entire roadway is 3,700 feet (1,128 m) long. Tolls are collected at a plaza on the west side of the roadway. As of June 2023, two-axle vehicles are charged $0.74 if paying via electronic toll collection or $1.48 if paying by mail invoice; this price increases for each additional axle.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.